Machining · Production & OEE

From planned production to readiness

A heavy-equipment manufacturing operation needed to review the machine, material, operator, tooling and procedural requirements for an ERP production order before work began.

Discuss production order readiness
Illustrative heavy-equipment operation in an open quarry
Industry illustration · Machining

Challenge

Operational challenge

An ERP order says what the plant intends to make. Before work can start, a planner also needs to know whether the material, machine, operator and tools are available and which maintenance or procedural checks apply.

Workflow

Operating workflow

  1. Identify the ERP order
  2. Review material and equipment readiness
  3. Check operator, tools and procedures
  4. Review outstanding items before execution

For an order approaching its planned start, the readiness review brings the outstanding requirements together. A missing tool and a machine awaiting maintenance call for different follow-up. Keeping each requirement associated with the order gives the planner a basis for discussing the next action with the shop-floor team.